Piling
Breathing life into piling
One of the most experienced parts of the Murphy Group, J M Piling Co. Ltd is an established contractor that operates a modern and growing fleet of piling equipment in the UK and Ireland. Strategically located depots throughout the country support a range of equipment that includes crawler mounted augers (rotary & cfa), pre-cast driven rigs and tripods.
Supported by our Trade Association Membership with CECA, our ‘design and construct’ service offers flexibility, rapid response and timely completion. Something that’s appreciated by our range of clients, including Kier, Mansell, Higgins, Durkans, Rydons, ROK, Willmot Dixon, Allenbuild, Gallifords, Geoffrey Osborne and Birse.
Our 40th anniversary year sees us continuing to provide piling services for: supporting dish aerials and sign gantries; supporting major reservoirs; basements and excavations; temporary support (kingpost construction); foundations for residential, commercial and industrial buildings; and civil engineering structures, bridges, retaining walls and restricted sites such as for railway work.
| Client | Project | Description |
| BAM Civils Ltd. | M7-M8, Portlaoise | Bored, Precast & Steel Bearing Piles to support approx 20 Bridges |
| John Paul Construction | Kevin Street Garda Station, Dublin | Contiguous Bored Pile Wall 600mm / 900mm |
| John Sisk & Son Ltd. | N9-N10, Kilkenny | 1200mm Diameter Rotary Auger Bored Rock Socketed Piles |
| M50 D&C Ltd. | M50, Dublin Road Widening | 900mm / 1200mm Diameter Piles to support various Bridges |
| Coffey Construction | Hazelhatch, Dublin Rail Embankment | Precast Concrete Driven Piles installed to support New Rail Line |
| Enercon, Germany | Flugland Wind Farm, Donegal | 900mm Diameter Rotary Auger Bored Piles to support Wind Turbines |
| Bowen-Somague J.V. | N7, Roscrea | 900mm Diameter Bored Rock Socketed Piles to support New Bridge |
| S.I.A.C. Construction | Dunboyne Rail Link | 1500mm Diameter Rock Socketed Piles to support New Rail Bridge over Canal |
| BAM Civils Ltd. | Rosslare Harbour | Tubular Steel & Combi Piles inserted into Bored Rock Socket 1200mm Diameter Pile |
| Bowen-Somague J.V. | Leopardstown LUAS | Retaining Wall Contiguous Piles & Pedestrian Access Support Piles |
| Mansell Construction Services | Peabody Estate | Construction of 122 No. 750mm diameter CFA bored piles |
| Inspace Partnership Limited | Beaufort Park, Hendon | Construction of 746 No. 350mm diameter auger bored piles |
| Durkan Limited | Prospect House | Construction of 35 No. 450 mm diameter auger bored piles |
| The Oakwood Group | Thornton Road, Croydon | Construction of 53 No. 350 diameter auger bored piles |
| Fredereck Sage Co. Ltd | Marlborough Place, London | Construction of 17 No. 400mm diameter auger bored piles |
| Lengard Limited | Eveline Lowe Primary School | Construction of 58 No. 400mm diameter bored piles |
| Kier London | Fairway & Northway School | Construction of 485 No. 350mm diameter bored piles |
| Mullaley & Co. Ltd | Churchfields Junior School, South Woodford | Construction of 307 No. 300mm diameter bored piles |
| Rydon Construction Limited | Clapham Homes, New Park Road, Clapham, SW4 | Construction of 321 No. 400mm and 262 No. 450mm diameter bored piles to be used as deep foundations and a secant wall. |
| Durkan Limited | Central Middlesex Hospital | Construction of 475 No. 300mm diameter bored piles |
| Kier London | Goodmayes Hospital, Essex | Construction of 571 No.350mm diameter rotary auger bored piles |
| Leighton & Henley Plc | Kensington Church Street, London W8 | Construction of 30 No. 400mm diameter rotary auger bored pilesConstruction of 120 No. 450mm diameter rotary auger bored piles |
| Durkan Limited | 2-4 Broadlands RoadHighgate, London, N6 4AS | Construction of 115 No. 300mm diameter auger bored pilesConstruction of 22 No. 300mm diameter auger bored pilesConstruction of 47 No. 300mm diameter auger bored pilesConstruction of 59 No. 300mm diameter auger bored pilesConstruction of 4 No. 450mm diameter Crane Base piles |
| Mansell Construction | Stephenson Street Bus Garage – Phase 3 | Construction of 60 No. 600mm diameter auger bored piles |
| Bamfords Trust Plc | East London Mosque – Phase 2 | Construction of 76 No. 600mm diameter auger bored pilesConstruction of 9 No. 300mm diameter auger bored pilesConstruction of 17 No. 400mm diameter auger bored pilesConstruction of 9 No. 4500mm diameter auger bored pilesConstruction of 13 No. 600mm diameter auger bored pilesConstruction of 8 No. 750mm diameter auger bored pilesConstruction of 5 No. 900mm diameter auger bored pilesConstruction of 4 No. 450mm Crane Base piles |
| Mansell Construction CLIENT | Wigmore StreetPROJECT | Construction of 39 No. 450mm diameter auger bored pilesConstruction of 17 No. 600mm diameter auger bored pilesDESCRIPTION |
| Higgins Construction Ltd | Caledonian Road | Construction of auger bored general piles and crane based piles |
| Laxcon Construction UK Ltd | Hindu Temple, King Street | Construction of 59nr. 400mm diameter auger bored piles. |
| Lancsville Construction Ltd | Hartfield Road | Construction of 33nr. 450mm diameter auger bored piles. |
| European interiors | Kay Streeet | Construction of 72nr. 400mm diameter auger bored piles. |
| Durkan Pudelek Ltd | Swiss Cottage Open Space | Construction of 27nr. 400mm diameter auger bored piles. |
| Durkan Ltd | 14 Triangle Road | Construction of 133nr. 400mm diameter auger bored piles. |
| Parkway Construction Ltd | 98 White Heart Lane | Construction of 80nr. 400mm diameter auger bored piles. |
| William Verry Ltd | Hendon Magistrates Courts | Construction of 99nr. 450 diameter auger bored piles. |
| Hg Construction Ltd | Cambria House | Construction of 45nr. 400mm diameter auger bored piles. |
| Laxcon construction (UK) Ltd | 38 Reddington Road | Construction of 17nr. 450mm diameter auger bored piles. |
| Willmott Dixon Housing Ltd | Gunnersbury Lane | Construction of 161nr. 400mm diameter auger bored piles. |
| Mansell Construction Ltd | Westway beacons | Construction of auger bored general piles and crane based piles. |
| HBG Construction Ltd | Basildon Hospital | Construction of auger bored general piles and crane based piles. |
| Kewmoore Construction Ltd | 353 Uxbridge Road | Construction of 57nr. 400mm diameter auger bored piles. |
| Higgins Homes Plc | Former Synagogue, Green Lanes | Construction of 149nr. 400 diameter auger bored piles. |
| Verry Construction Ltd | St Charles Hospital | Construction of 42nr. 450mm diameter auger bored piles. |
| Durkan Ltd | Lansdowne Road | Construction of 1nr Borehole. 400mm diameter |
| Malik Construction Ltd | 158 Harrow Road | Bore Construct 47nr 350mm nominal diameter piles. |
| TRAK Residential Ltd | High Hill Ferry | Construction of 101nr. 450mm diameter auger bored piles. |
| Village Homes (South East) Ltd | Goodyers Close Radlett | Construction of 45nr. 350mm diameter auger bored piles. |
| Lynmeth Construction Ltd | 70 Parrock Street | Construction of 59nr. 400mm diameter auger bored piles. |
| Keir London Limited | Former Gosai Cinema, Nothfield Avenue | Construction of rotary bored piles and crane based piles |
| Durkan Ltd | 26 -40 High Street Slough | Construction of 267nr. 600mm diameter auger bored piles. |
| Bamfords Trust Plc | Darul Uloom School | Construction of 64nr. 400mm diameter auger bored piles. |
| Allenbuild Ltd | North London Collegiate School | Construction of 86nr. 450mm diameter auger bored piles. |
| Galliford Try Construction Ltd | Oxford Centre for Islamic Studies | Construction of 28nr. 400mm diameter auger bored piles. |
| J Murphy and Sons Ltd | Wimbledon Grid Sub-station | Construction of 9nr. 400mm diameter auger bored piles. |